AIMTEQ INSTALL SCHNEIDER ECOSTRUXURE BMS AT THE UNIVERSITY OF MANCHESTER’S NEW EXECUTIVE EDUCATION CENTRE
Wohoo, it’s new case study time. READ THE FULL CASE STUDY HERE.
We recently completed the installation of a brand new Schneider Electric EcoStruxure BMS system at the University of Manchester’s Executive Education building.
We completed the installation following the award of the contract from mechanical and electrical contractors, A&B Engineering in Liverpool. The Executive Education building forms part of the Manchester Business School which is located in Manchester’s Oxford Road corridor and is part of the University of Manchester’s ambitious redevelopment ‘masterplan’.
The desired outcomes have absolutely been achieved. Aimteq have now demonstrated they are a perfect partner for A&B Engineering going forward.
Gary Dwyer, Director, A&B Engineering
Need help with a BMS installation or upgrade?
If you’re looking for some help, advice or an install of a BMS, why not get in touch – we’re always happy to chat BMS. You can give us a call on 0161 475 1777, email info@aimteq.co.uk or get in touch using our quote form.
Its great to see how a complete system looks like and very proud to advice the great team to bring the technology to Kenya in particular.
Need to know how it works and possible short guidance notes to help us advice on its applicability in our buildings in Kenya.
Hi George. Thanks for taking the time to comment. Unfortunately, we don’t operate in Kenya and won’t be familiar with your in-country standards, so cannot provide advice. If it’s specifically a Schneider Electric system you’re looking to install, I suggest you contact Schneider Electric themselves, or find an EcoStruxure partner in Kenya. A list can be found here: https://www.schneider-electric.co.uk/en/partners/ecoxpert/