It’s always nice when one of our case studies gets picked up by a print publication. This month, Building & Facilities Management (BFM) magazine featured our recent TransPennine Express case study in their HVAC section.

If you’ve not already had a scan over the case study, you can download an online version here. We don’t ask for any personal details, when downloading, it’s literally just a link to a cool looking case study that showcases some great multi-site retrofit BEMS install work from the guys in our operations team and some fantastic strategy optimisations from our the staff in the ROC.

…the figures show the lowest energy consumption for five years over comparable periods for those stations that haven’t had major infrastructure upgrades, such as new lifts.

Iain Peacock, Environment & Emergency Planning Manager – TransPennine Express

Need help with a station or depot?

We’ve got a wealth of experience providing retrofit BEMS and control solutions in transport and repair depots, and now in train stations too. If you’ve got similar issues to TransPennine Express, why not get in touch for an informal chat. If you;d rather, you can read our other transport sector case studies – we’ve worked with both Stagecoach and Go-Ahead on an ongoing basis.

KBR save £22,000 in the first year thanks to BMS maintenance contract from Aimteq
KBR - A BMS maintenance client - Siemens Desigo Insight System

NEW BMS MAINTENANCE CONTRACT HELPS KBR SAVE £22,000